Kala has conducted numerous dewatering studies throughout the province of British Columbia. These are either temporary, for example to assist with construction or permanent dewatering considerations for foundation engineering purposes. In addition, Kala provides solutions for groundwater dewatering for onsite wastewater disposal considerations.
Here are a few of our clients and projects:
- BC Hydro – John Hart Generating Station - Campbell River, BC
- $1.06 Billion upgrading project
- New powerhouse – foundation excavation to 34 m in depth, 30 m from Campbell River
- Excavation area: 7,000 sq m
- Sonic and rotary drilling programs
- Large scale pumping tests
- Environmental implications of contaminated sites
- Numerical modeling and calibration
- River recharge simulations
- Health and Safety Plan (HASP), Environmental Protection Plan (EPP), Emergency Response Plan (ERP), and Standard Operating Procedure (SOP) requirements
- Design of cutoff walls and pumping scenarios